-
949
Alcoa Juruti Bauxite Mine
Project name :
Alcoa Juruti Bauxite Mine
Client :
Alcoa
Location :
Juruti, Brazil
Alcoa Juruti Bauxite Mine
We provided mine development services, as well as project management and support in the development of the Operations Readiness Plan (ORP).
-
948
Alcoa Project Controls System Development
Project name :
Alcoa Project Controls System Development
Client :
Alcoa
Location :
Pittsburgh, PA, United States
Alcoa Project Controls System Development
Exp provided project management services which encompassed the development and implementation of a Stage Gate-based Project Management System with worldwide application on all of the client's major projects including: Power Plants, Aluminum Smelters, Ports, Bauxite Mines and Refineries.
-
951
Ambatovy Nickel - Project Development
Project name :
Ambatovy Nickel - Project Development
Client :
Sherritt International Corporation- Owners Project Group
Location :
Ambatovy, Madagascar
Ambatovy Nickel - Project Development
This project integrated many installations of various nature in the treatment of slurried laterite ore towards the production of 99.9 % pure nickel and cobalt briquettes. Exp provided project management services and support in the development of the operations.
-
320
Aquarius Gold Mine
Project name :
Aquarius Gold Mine
Client :
Echo Bay Mines Ltd./Kiewit Kilborn
Location :
Timmins, ON, Canada
Aquarius Gold Mine
Aquarius Gold Mine is a proposed open pit mine and mill complex covering a total surface area of three km2. De-watering the open pit using traditional methods was not the best option, so exp recommended an artificially frozen earth cut-off wall surrounding the open pit to best minimize inward groundwater seepage into the pit during dewatering and mining operations. The frozen earth cut-off was 3.5 km in length and extended to depths of up to 135 m, making it the largest and longest artificially frozen earth wall ever built. We managed the project and provided consulting services for this project.
-
947
Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings
Project name :
Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings
Client :
Cape Breton Development Corporation
Location :
Cape Breton, NS, Canada
Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings
Our team was part of an interdisciplinary, inter-governmental private sector university team that investigated the nature and origin of saline groundwater inflow into CBDC's subsea coal mines. The team also looked at porosity and permeability of sandstones, overall mine water chemistry and outburst problems. This work was completed over three years with the results published in a three volume report.
-
946
Melford Gypsum Mine - Stream Monitoring
Project name :
Melford Gypsum Mine - Stream Monitoring
Client :
Georgia-Pacific Canada, Inc.
Location :
Melford, NS, Canada
Melford Gypsum Mine - Stream Monitoring
Exp implemented and continues to analyze the results of an ongoing, four year monitoring program encompassing nine stations on six streams within and adjacent to the mine site. Sampling is carried out weekly throughout the calendar year. The streams drain a wide variety of environments, including wetlands, karstic terrain (sinkholes), granite uplands and gravel outwash floodplains.
-
945
Melford Gyspum Mine - Noise and Dust Monitoring
Project name :
Melford Gyspum Mine - Noise and Dust Monitoring
Client :
Georgia-Pacific Canada, Inc.
Location :
Melford, NS, Canada
Melford Gyspum Mine - Noise and Dust Monitoring
We provided the design, implementation and acquisition of baseline noise and dust conditions at the mine site prior to site development. These data formed the basis of ongoing, bi-weekly compliance monitoring at three stations during site development.
-
952
Sifto Salt Mines
Project name :
Sifto Salt Mines
Client :
Sifto Canada Corp.
Location :
Goderich, ON Canada
Sifto Salt Mines
Our team was retained to assess the quality and structural integrity of the concrete liners for two of three shafts. The scope of work included a complete visual assessment during which all areas of significant deterioration, water ingress and section loss were documented; vertical face coring of the concrete liner at representative locations; laboratory testing of core samples for strength and quality/durability parameter; and laser measurement of the shaft profile to assess section loss.
-
950
Zinc Bar Production Plant - Plant Equipment Improvements
Project name :
Zinc Bar Production Plant - Plant Equipment Improvements
Client :
CZEZinc. (Noranda Income Group)
Location :
Salaberry de Valleyfield, QC, Canada
Zinc Bar Production Plant - Plant Equipment Improvements
Exp was appointed to implement the project management system. We managed the design, procurement, construction, training and commissioning activities for a project calling for the capacity increase of a zinc bar production plant, while maintaining the current plant operations. The project included the construction of new industrial and administrative buildings and the reparation, renovation and restoration of closed down buildings.