  • 949

    Alcoa Juruti Bauxite Mine

    Project name :

    Alcoa Juruti Bauxite Mine

    Client :

    Alcoa

    Location :

    Juruti, Brazil

    Alcoa Juruti Bauxite Mine

    We provided mine development services, as well as project management and support in the development of the Operations Readiness Plan (ORP).

    Alcoa Juruti Bauxite Mine Alcoa Juruti Bauxite Mine Alcoa Juruti Bauxite Mine
  • 948

    Alcoa Project Controls System Development

    Project name :

    Alcoa Project Controls System Development

    Client :

    Alcoa

    Location :

    Pittsburgh, PA, United States

    Alcoa Project Controls System Development

    Exp provided project management services which encompassed the development and implementation of a Stage Gate-based Project Management System with worldwide application on all of the client's major projects including: Power Plants, Aluminum Smelters, Ports, Bauxite Mines and Refineries.

    Alcoa Project Controls System Development Alcoa Project Controls System Development
  • 951

    Ambatovy Nickel - Project Development

    Project name :

    Ambatovy Nickel - Project Development

    Client :

    Sherritt International Corporation- Owners Project Group

    Location :

    Ambatovy, Madagascar

    Ambatovy Nickel - Project Development

    This project integrated many installations of various nature in the treatment of slurried laterite ore towards the production of 99.9 % pure nickel and cobalt briquettes. Exp provided project management services and support in the development of the operations.

    Ambatovy Nickel - Project Development
  • 320

    Aquarius Gold Mine

    Project name :

    Aquarius Gold Mine

    Client :

    Echo Bay Mines Ltd./Kiewit Kilborn

    Location :

    Timmins, ON, Canada

    Aquarius Gold Mine

    This project was a proposed open pit gold mine and mill complex. To develop the proposed 1 km-diameter open pit, dewatering of the saturated overburden was required; traditional methods would have resulted in the drawdown of several adjacent lakes during dewatering, overburden excavation, and mining operations. We recommended the construction of an artificially frozen earth cutoff wall around the 3.5 km perimeter of the proposed open pit. The frozen earth cutoff wall was installed to depths ranging from 90 m to 135 m through the overburden and into the bedrock surface. Unfortunately, the Aquarius project was cancelled just before commissioning of the frozen earth cut wall. Had it been activated, it would have been the deepest and longest frozen earth wall ever built. Exp managed the geotechnical and hydrogeological work at the site; the drilling program included as many as 16 drill rigs operating at one time, advancing the freeze pipes around the open pit perimeter.

    Aquarius Gold Mine
  • 1801

    BP Emergency Services Building

    Project name :

    BP Emergency Services Building

    Client :

    BP Whiting Refinery

    Location :

    Whiting, Indiana, USA

    Exp designed the new Emergency Services Building (ESB) including the BP Whiting firehouse and security services. The ESB is a multi-functional program including offices, conference rooms, a training center, locker rooms, a dispatch room, a maintenance shop, decontamination rooms, and a 6 bay apparatus building. Exp's extensive roll in construction delivery includes the implementation of the Integrated Project Delivery (IPD) method.

    BP Emergency Services Building BP Emergency Services Building BP Emergency Services Building BP Emergency Services Building
  • 351

    Canada's Malting Co. Silos

    Project name :

    Canada's Malting Co. Silos

    Client :

    Toronto Waterfront Revitalization Corp.

    Location :

    Toronto, ON, Canada

    Canada's Malting Co. Silos

    This malting facility was originally built in 1928. The site had been abandoned for more than 20 years, incurring significant water infiltration to 29 malting silos and a germination/kiln unit. The resulting water damage required a comprehensive structural assessment before opening the adjacent grounds to the public as part of the city of Toronto's waterfront revitalization efforts. Our team prepared a comprehensive building condition assessment to establish the status of the silos and other buildings on site noting any potential areas requiring rehabilitation and/or upgrades. In addition to standard engineering principles to define work required to the facility, we also designed a lowering video camera apparatus to conduct remote inspection of the interior walls and related structures.

    Canada's Malting Co. Silos
  • 947

    Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings

    Project name :

    Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings

    Client :

    Cape Breton Development Corporation

    Location :

    Cape Breton, NS, Canada

    Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings

    Our team was part of an interdisciplinary, inter-governmental private sector university team that investigated the nature and origin of saline groundwater inflow into CBDC's subsea coal mines. The team also looked at porosity and permeability of sandstones, overall mine water chemistry and outburst problems. This work was completed over three years with the results published in a three volume report.

    Cape Breton Subsea Coal Mines - Saline Groundwater Inflow to Mine Workings
  • 946

    Melford Gypsum Mine - Stream Monitoring

    Project name :

    Melford Gypsum Mine - Stream Monitoring

    Client :

    Georgia-Pacific Canada, Inc.

    Location :

    Melford, NS, Canada

    Melford Gypsum Mine - Stream Monitoring

    Exp implemented and continues to analyze the results of an ongoing, four year monitoring program encompassing nine stations on six streams within and adjacent to the mine site. Sampling is carried out weekly throughout the calendar year. The streams drain a wide variety of environments, including wetlands, karstic terrain (sinkholes), granite uplands and gravel outwash floodplains.

    Melford Gypsum Mine - Stream Monitoring
  • 945

    Melford Gyspum Mine - Noise and Dust Monitoring

    Project name :

    Melford Gyspum Mine - Noise and Dust Monitoring

    Client :

    Georgia-Pacific Canada, Inc.

    Location :

    Melford, NS, Canada

    Melford Gyspum Mine - Noise and Dust Monitoring

    We provided the design, implementation and acquisition of baseline noise and dust conditions at the mine site prior to site development. These data formed the basis of ongoing, bi-weekly compliance monitoring at three stations during site development.

    Melford Gyspum Mine - Noise and Dust Monitoring
  • 350

    Molson Brewery Plants

    Project name :

    Molson Brewery Plants

    Client :

    Molson Brewery

    Location :

    Montreal, QC and Edmonton, AB, Canada

    Molson Brewery Plants

    The project objective was to pinpoint energy savings measures that would generate a three-year return on investment through an audit of Molson's ammonia refrigeration systems via an analysis of critical and/or high energy consumption processes. We provided: design, specifications and drawings for new ammonia cooling towers and pumping stations and high performance evaporators; layout and piping diagrams for large oil separators; and control philosophy for the compressor control room, based on new discharge and suction pressures and liquid ammonia flow rates.

    Molson Brewery Plants
  • 952

    Sifto Salt Mines

    Project name :

    Sifto Salt Mines

    Client :

    Sifto Canada Corp.

    Location :

    Goderich, ON Canada

    Sifto Salt Mines

    Our team was retained to assess the quality and structural integrity of the concrete liners for two of three shafts. The scope of work included a complete visual assessment during which all areas of significant deterioration, water ingress and section loss were documented; vertical face coring of the concrete liner at representative locations; laboratory testing of core samples for strength and quality/durability parameter; and laser measurement of the shaft profile to assess section loss.

    Sifto Salt Mines Sifto Salt Mines
  • 950

    Zinc Bar Production Plant - Plant Equipment Improvements

    Project name :

    Zinc Bar Production Plant - Plant Equipment Improvements

    Client :

    CEZinc. (Noranda Income Group)

    Location :

    Salaberry de Valleyfield, QC, Canada

    Zinc Bar Production Plant - Plant Equipment Improvements

    Exp was appointed to implement the project management system. We managed the design, procurement, construction, training and commissioning activities for a project calling for the capacity increase of a zinc bar production plant, while maintaining the current plant operations. The project included the construction of new industrial and administrative buildings and the reparation, renovation and restoration of closed down buildings.

    Zinc Bar Production Plant - Plant Equipment Improvements Zinc Bar Production Plant - Plant Equipment Improvements