• 321

    Chute Allard and Rapides-des-Coeur Generating stations

    Project name :

    Chute Allard and Rapides-des-Coeur Generating stations

    Client :

    Hydro-Québec

    Location :

    St. Maurice River, QC, Canada

    Chute Allard and Rapides-des-Coeur Generating Stations

    Our team has worked with Hydro-Québec on this project in many ways. First, we performed impact assessments prior to construction authorization and a sectoral study of the bank geomorphology and dynamics created by future developments. Later, we provided detailed engineering of the ancillary services for the facilities. This included preparing equipment design notes and detailed working drawings for auxiliary electrical and mechanical systems.

    Chute Allard and Rapides-des-Coeur Generating stations Chute Allard and Rapides-des-Coeur Generating stations Chute Allard and Rapides-des-Coeur Generating stations Chute Allard and Rapides-des-Coeur Generating stations Chute Allard and Rapides-des-Coeur Generating stations
  • 346

    Shawinigan Dam Complex

    Project name :

    Shawinigan Dam Complex

    Client :

    Hydro-Québec

    Location :

    Shawinigan, QC, Canada

    Shawinigan Dam Complex

    Due to the age of this facility (originally commissioned in 1914), Hydro-Québec decided to upgrade the plant. The complex has eight turbine-alternator groups, and our team was contracted to conduct preliminary project studies and provide detailed engineering services covering most aspects of the plant. This included design and production of drawings and specs for the supply, installation and construction of equipment and systems, managing engineering works and coordination with sub-contractors and between different specialties and manufacturers.

    Shawinigan Dam Complex Shawinigan Dam Complex Shawinigan Dam Complex Shawinigan Dam Complex Shawinigan Dam Complex